Thank you everyone!
I'm on 1 week's annual leave and had the
intention of fitting a shower unit c/w shower (

), fully tiling the bathroom and fitting new sink & storage.
Then the floorboards decided to be so uneven as to need totally replacing.
And there's always someone who needs to pee or something 5 minutes after I've removed the karzi pan.................
So I have now finished replacing the floor.
And it's now Friday and all I have left to do is tank the walls, fit the shower cubicle, tile it out, grout it, fit the electric shower, plumb it in, get a spark to wire it up and fit an extractor fan, strip and tile the rest of the walls, fit the cupboards and the sink, plumb it in, fit vinyl flooring or something similar......
*sigh*